30+ Years of Experience

Professional management for homes, societies, offices and commercial spaces.

Information

+91 93810 39231 +91 99948 43057 support@cpcs.co.in # 2/7, 1st Street, Velayutham Colony, Saligramam, Chennai - 600093.

Follow Us

Post-Constructional Anti Termite Treatment

Commercial Inspection-led treatment 30+ Years Experience

Corrective termite treatment for completed properties with drilling, injection and targeted treatment of active termite routes.

Post-construction anti termite treatment is used when the building is already occupied or finished. Since termite routes are hidden behind flooring, walls, woodwork and service lines, the treatment focuses on tracing activity, creating treated zones at entry points and protecting vulnerable wooden members.

  • Best for: Planned protection and high-risk sites

    This service is designed for properties where access, compliance, construction stage or operational hygiene needs a more structured pest control plan.
  • Method: Survey-led execution

    We inspect first, choose the right application method, coordinate site readiness and explain what needs to be maintained after service.

Completed-site termite indicators

  • Mud tubes near skirting, door frames, wall corners, ducts or bathrooms.
  • Damage in wardrobes, plywood, fixed furniture, wall panels or frames.
  • Termite activity returning after spot spraying or home remedies.
  • Moisture near plumbing lines, seepage patches or soil contact outside walls.

Our Treatment Approach

01

Inspect activity, moisture and building entry routes before drilling.

02

Drill and inject at wall-floor junctions, affected rooms and access points where required.

03

Treat wooden fixtures, voids and active galleries based on infestation severity.

04

Seal points neatly after treatment and provide monitoring instructions.

Before Our Team Arrives

  • Move furniture away from affected walls and skirting.
  • Clear wardrobes, cabinets and storage close to termite activity.
  • Protect electronics, valuables and loose documents.
  • Tell the technician about hidden plumbing, electrical lines or recent renovation.

After Service Care

  • Avoid washing treated junctions immediately after service.
  • Repair seepage and dampness to reduce termite pressure.
  • Do not cover active areas with new furniture before inspection is complete.
  • Schedule follow-up checks if mud tubes or fresh powder appears.
Why it works

Advanced service needs planning, access control and clear handover.

We keep the service practical: inspect the site, treat the right zones, explain operational precautions and leave the customer with concrete prevention steps.

Frequently Asked Questions

Will drilling damage my floor?

Drilling is planned at required junctions and points are sealed after treatment.

How is this different from pre-construction service?

Can one room be treated?

Book an Inspection

Ask about Post-Constructional Anti Termite Treatment or request a free quote after a site visit.

+91 93810 39231 WhatsApp Us

Service Checklist

  • Inspection before treatment
  • Targeted application by trained staff
  • Clear preparation and aftercare notes
  • Follow-up advice for recurring activity